Building Construction & Pre-Incident Planning
Hours
2
ISO Category
Company
Equipment
Pre-plan forms / app, measuring tools, camera

Instructor-led discussion or in-the-field walk-through of building construction and pre-incident planning. Officer selects focus. Topics that fit this sheet include: NFPA 220 construction types (I-V), Type V (light frame) hazards including lightweight wood truss and engineered I-joists, fire behavior in different construction types, collapse indicators and time-to-failure under fire, modern vs legacy construction, occupancy classifications, fire load and fuel package, built-in fire protection (sprinklers, standpipes, FDC, alarm panel), pre-incident plan development and update, hazards and access (gates, locks, knox box), utility shutoffs (gas, electric, water), water supply (hydrants, FDC pressure), special hazards (solar, batteries, hazmat, confined space). Reference: NFPA 1620 (Pre-Incident Planning), NFPA 220, NFPA 1001. Document specific building or topic covered.

  1. 1. Identify construction type and key hazards.
  2. 2. Describe collapse indicators relevant to the construction.
  3. 3. Locate FDC, hydrants, alarm panel, and utility shutoffs (if site visit).
  4. 4. Update or review pre-incident plan as appropriate.
  5. 5. Discuss tactical implications for initial-arriving crews.