A 4-hour measured rapid-intervention drill from NFPA 1400 (2026) Chapter 45. The nozzle team stays on the line. The clock stops when the removal the book names is finished. Mayday on a Working Fire is still the longer drill. NFPA 1400 (2026), Chapter 45, Required Performance for Rapid Intervention Crews (RIC). These measured emergency-scene evolutions used to be published as NFPA 1410. Use the 2026 copy the department owns. Facility training: 4 hours, structural gear, at the training facility or an approved training facility. It does not count under 3 hours, out of gear, or as a classroom talk.