A 4-hour measured standpipe-support drill from NFPA 1400 (2026) Chapter 43. Two supply lines to the standpipe or the combined connection, every inlet the system needs, at the system demand. The booster tank is not the supply. A building with pressure-reducing valves needs that full demand at the connection. NFPA 1400 (2026), Chapter 43, Required Performance for Standpipe System Support. These measured emergency-scene evolutions used to be published as NFPA 1410. Use the 2026 copy the department owns. Facility training: 4 hours, structural gear, at the training facility or an approved training facility. It does not count under 3 hours, out of gear, or as a classroom talk.