A 4-hour measured truck-company drill from NFPA 1400 (2026) Chapter 44. Ladders ready to climb, a door forced and controlled, and a search run the way the 2026 book describes it: size-up, door or window entry, the search the building needs, and a removal decision. Vent the fire only after a charged line is ready. NFPA 1400 (2026), Chapter 44, Required Performance for Truck Company Operations. These measured emergency-scene evolutions used to be published as NFPA 1410. Use the 2026 copy the department owns. Facility training: 4 hours, structural gear, at the training facility or an approved training facility. It does not count under 3 hours, out of gear, or as a classroom talk.