Patch

Peach
Fire Department

Training Report
Firefighter I · 6.3.15 · Water supply
Hours
2
ISO Category
Company
Equipment
Structural PPE, and SCBA when the skill is in an IDLH atmosphere. The hose, ladders, rope, or tools the task names. Department SOP if it is tighter than these objectives.

As a team, connect the pumper to a hydrant or a static source with tight couplings and a clear waterway. Firefighter I — NFPA 1010 Chapter 6. Task 6.3.15. Training objective. Assign it and watch it get done. Signing this sheet records the training.

  1. Know — Loading and unloading mobile water supply apparatus.
  2. Know — Hydrant operation.
  3. Know — Usable static sources and the local connection steps.
  4. Do — Hand-lay supply hose.
  5. Do — Connect and place hard suction for a draft.
  6. Do — Deploy portable tanks and the equipment that transfers or drafts from them.
  7. Do — Make forward and reverse lays, connect the hydrant, and open and close it all the way.
NameRankGFSTC #Signature
NameRankGFSTC #Signature

Firefighters from other departments. Add each person by hand, then tap to sign.

NameDepartmentRankGFSTC #Signature
EquipmentDamagedComments
Punctual · Valuable · Selfless

Submitted

Stop — Check Your Work

Tick every box to confirm. PDF will not download until all 7 are checked.
Please check after yourself before downloading. If anything below is not done, go back and fix it before you submit.
  • Time is entered correctly in 24-hour format (e.g. 0800, 1330).
  • Hours are whole numbers only — NO .5. Use 3, 4, 8 — not 3.5.
  • Description and objectives are filled out correctly.
  • All personnel participating have signed.
  • Driver Training: If personnel did NOT drive, they do NOT sign — they need an Area Familiarization sign-in instead.
  • Facility training is at least 3 hours, in gear, at the training facility or an approved training facility. Structural, vehicle, or wildland.
  • Reviewed everything above. Questions? Call Dorman BEFORE submitting.
0 of 7 confirmed

Sign Here