Patch

Peach
Fire Department

Training Report
Firefighter II · 7.5.3 · Preincident survey
Hours
2
ISO Category
Company
Equipment
Structural PPE, and SCBA when the skill is in an IDLH atmosphere. The hose, ladders, rope, or tools the task names. Department SOP if it is tighter than these objectives.

Record the occupancy, note what matters, and draw a sketch someone else can use. Firefighter II — NFPA 1010 Chapter 7. Task 7.5.3. Training objective. Assign it and watch it get done. Signing this sheet records the training.

  1. Know — Water supply for the site.
  2. Know — Basics of suppression and detection systems.
  3. Know — Symbols for construction, utilities, hazards, and fire protection.
  4. Know — What the department form demands, and why a bad sketch is worse than none.
  5. Do — Identify suppression and detection components.
  6. Do — Sketch the site, the buildings, and the special features.
  7. Do — Catch hazards and special considerations.
  8. Do — Finish the forms.
NameRankGFSTC #Signature
NameRankGFSTC #Signature

Firefighters from other departments. Add each person by hand, then tap to sign.

NameDepartmentRankGFSTC #Signature
EquipmentDamagedComments
Punctual · Valuable · Selfless

Submitted

Stop — Check Your Work

Tick every box to confirm. PDF will not download until all 7 are checked.
Please check after yourself before downloading. If anything below is not done, go back and fix it before you submit.
  • Time is entered correctly in 24-hour format (e.g. 0800, 1330).
  • Hours are whole numbers only — NO .5. Use 3, 4, 8 — not 3.5.
  • Description and objectives are filled out correctly.
  • All personnel participating have signed.
  • Driver Training: If personnel did NOT drive, they do NOT sign — they need an Area Familiarization sign-in instead.
  • Facility training is at least 3 hours, in gear, at the training facility or an approved training facility. Structural, vehicle, or wildland.
  • Reviewed everything above. Questions? Call Dorman BEFORE submitting.
0 of 7 confirmed

Sign Here