Patch

Peach
Fire Department

Training Report
Support Person · 5.5.2 · Clean ladders, fans, rope, salvage gear, and hand tools
Hours
2
ISO Category
New Recruit
Equipment
The support ensemble the department issues, and the tools the task names. This level stays out of atmospheres that need respiratory protection.

Clean and check the assigned equipment, write down the maintenance, and put it back ready or tag it out. Support Person — NFPA 1010 Chapter 5. Task 5.5.2. Training objective. Assign it and watch it get done. Signing this sheet records the training.

  1. Know — Which cleaning method fits which tool.
  2. Know — How to use the solvent without wrecking the equipment or yourself.
  3. Know — The manufacturer or department cleaning rules.
  4. Do — Pick the right tool and supplies for the piece in front of you.
  5. Do — Follow the guideline.
  6. Do — Complete the record, or report equipment that is not ready.
NameRankGFSTC #Signature
NameRankGFSTC #Signature

Firefighters from other departments. Add each person by hand, then tap to sign.

NameDepartmentRankGFSTC #Signature
EquipmentDamagedComments
Punctual · Valuable · Selfless

Submitted

Stop — Check Your Work

Tick every box to confirm. PDF will not download until all 7 are checked.
Please check after yourself before downloading. If anything below is not done, go back and fix it before you submit.
  • Time is entered correctly in 24-hour format (e.g. 0800, 1330).
  • Hours are whole numbers only — NO .5. Use 3, 4, 8 — not 3.5.
  • Description and objectives are filled out correctly.
  • All personnel participating have signed.
  • Driver Training: If personnel did NOT drive, they do NOT sign — they need an Area Familiarization sign-in instead.
  • Facility training is at least 3 hours, in gear, at the training facility or an approved training facility. Structural, vehicle, or wildland.
  • Reviewed everything above. Questions? Call Dorman BEFORE submitting.
0 of 7 confirmed

Sign Here