Patch

Peach
Fire Department

Training Report
Wildland Firefighter II · 5.3.2 · Maintain chainsaws and pumps
Hours
2
ISO Category
Company
Equipment
Structural PPE, and SCBA when the skill is in an IDLH atmosphere. The hose, ladders, rope, or tools the task names. Department SOP if it is tighter than these objectives.

Service a chainsaw and a portable or engine-mounted pump so either one will start when the fire needs it. Wildland Firefighter II — NFPA 1140 Chapter 5. Task 5.3.2. Training objective. Assign it and watch it get done. Signing this sheet records the training.

  1. Know — Daily saw maintenance, fuel, chain, and the PPE that goes with a saw (chaps, eye, ear).
  2. Know — Pump maintenance, fuel, and the accessories that have to be with the pump.
  3. Do — Inspect, fuel, start, stop, and store a saw.
  4. Do — Inspect and service a pump. Operation on the fire is 5.5.4 and 5.5.5.
NameRankGFSTC #Signature
NameRankGFSTC #Signature

Firefighters from other departments. Add each person by hand, then tap to sign.

NameDepartmentRankGFSTC #Signature
EquipmentDamagedComments
Punctual · Valuable · Selfless

Submitted

Stop — Check Your Work

Tick every box to confirm. PDF will not download until all 7 are checked.
Please check after yourself before downloading. If anything below is not done, go back and fix it before you submit.
  • Time is entered correctly in 24-hour format (e.g. 0800, 1330).
  • Hours are whole numbers only — NO .5. Use 3, 4, 8 — not 3.5.
  • Description and objectives are filled out correctly.
  • All personnel participating have signed.
  • Driver Training: If personnel did NOT drive, they do NOT sign — they need an Area Familiarization sign-in instead.
  • Facility training is at least 3 hours, in gear, at the training facility or an approved training facility. Structural, vehicle, or wildland.
  • Reviewed everything above. Questions? Call Dorman BEFORE submitting.
0 of 7 confirmed

Sign Here