Patch

Peach
Fire Department

Training Report
Wildland Firefighter II · 5.5.5 · Pump on the assignment
Hours
2
ISO Category
Company
Equipment
Structural PPE, and SCBA when the skill is in an IDLH atmosphere. The hose, ladders, rope, or tools the task names. Department SOP if it is tighter than these objectives.

Produce the water the hose lay needs from a portable or engine-mounted pump. Wildland Firefighter II — NFPA 1140 Chapter 5. Task 5.5.5. Training objective. Assign it and watch it get done. Signing this sheet records the training.

  1. Know — Pump choice, water source, prime, pressure, and flow.
  2. Do — Spot the pump, assemble the accessories, prime, start, run at the needed pressure and flow, refuel for continuous work, and shut down.
NameRankGFSTC #Signature
NameRankGFSTC #Signature

Firefighters from other departments. Add each person by hand, then tap to sign.

NameDepartmentRankGFSTC #Signature
EquipmentDamagedComments
Punctual · Valuable · Selfless

Submitted

Stop — Check Your Work

Tick every box to confirm. PDF will not download until all 7 are checked.
Please check after yourself before downloading. If anything below is not done, go back and fix it before you submit.
  • Time is entered correctly in 24-hour format (e.g. 0800, 1330).
  • Hours are whole numbers only — NO .5. Use 3, 4, 8 — not 3.5.
  • Description and objectives are filled out correctly.
  • All personnel participating have signed.
  • Driver Training: If personnel did NOT drive, they do NOT sign — they need an Area Familiarization sign-in instead.
  • Facility training is at least 3 hours, in gear, at the training facility or an approved training facility. Structural, vehicle, or wildland.
  • Reviewed everything above. Questions? Call Dorman BEFORE submitting.
0 of 7 confirmed

Sign Here